Yes, almost every business sign in Dubai needs a permit before it goes up. Dubai’s advertising law requires a permit for any advertisement in the emirate, and every business must display a façade sign showing its trade name and activity (Decree No. 6 of 2020, Art. 4). For mainland shopfront signs, the Department of Economy and Tourism (DET) issues the permit. Free zones, Dubai Municipality and the RTA handle other locations and sign types, and most buildings also need landlord or developer approval.
Do You Need Signage Approval in Dubai?
In most cases, yes. The permit requirement applies to advertisements across the emirate, and a business’s own trade-name sign is covered by the same law (Decree No. 6 of 2020, Art. 4).
Check the requirements before your sign is made, not after. A design that breaks the rules, such as Arabic in the wrong place or a sign on an upper-floor façade, has to be redesigned and refabricated. Because a permit is tied to a specific sign, also check with the authority before changing the design, size or position of an existing sign.
Which Authorities Handle Signage Approval in Dubai?
The authority depends on where the sign is and what it is. Decree No. 6 of 2020 (Art. 5) divides responsibility as follows.
| Sign or location | Approving authority |
|---|---|
| Shopfront trade-name sign, mainland Dubai | Department of Economy and Tourism (DET), formerly DED (Dubai Civility Committee) |
| Advertising on buildings, rooftops, vacant land, coastal and desert areas | Dubai Municipality (DM services) |
| Advertising in the road right of way, on public transport or vehicles | Roads and Transport Authority (RTA) |
| Signs inside a free zone or special development zone | That zone’s authority, for example the Dubai Development Authority (DDA) for its free-zone areas (DDA) |
| Signboards in historical areas | Dubai Municipality (design and implementation approval) |
The design rules most shop signs follow come from the Out-of-Home Advertising Technical Guide, issued by the RTA and Dubai Municipality. DET applies it to commercial signs and inspects them for compliance.
Government permits are not the only approval. Your landlord, mall management or master developer may have its own signage rules and must usually give a no-objection certificate (NOC). If your activity is regulated (healthcare, education, real estate, events), the relevant sector regulator’s NOC may also be needed.
Dubai Signage Rules and Requirements
These rules apply to storefront signs (Dubai Civility Committee, May 2026; Decree No. 6 of 2020, Art. 11):
- Arabic and English: Arabic must be the main language and cover at least 50% of the sign, placed at the top or right-hand side, with no spelling or grammar mistakes. On storefront signs, Arabic goes on the upper line and English below.
- One trade name: only one trade name per store; multiple advertisements or trade names on the façade are not allowed.
- Layout: signs must be horizontal, not vertical, and may project from one side only.
- Size: proportionate to the height and width of the façade, without excessive height, width or thickness.
- Placement: no signs on balconies, and no signs on exterior façades of offices, clinics or shops above the ground floor.
- Lighting: brightness must stay within the permitted levels, measured with approved devices. Avoid bright white backgrounds.
- Digital content: storefront signs must be static; videos and animated content are not allowed.
- After approval: show the permit number as required, keep a copy of the permit on site, and don’t transfer it to another party.
Exact dimensions and brightness values are set in Section 3.4 of the Technical Guide, so confirm them with your signage company or the authority before production.

Documents Required for Signage Approval
Requirements vary by authority. The list below follows the DDA’s published checklist, which reflects what authorities commonly ask for.
| Document | When needed |
|---|---|
| Trade licence of the business (and the contractor) | Always |
| Scaled, coloured drawing with dimensions, cross-section and materials | Always |
| Photo of the existing façade and a mock-up of the sign on it | Always |
| Location map or site plan | Always |
| Landlord or plot owner NOC | When installing on a building you don’t own |
| Contractor appointment letter | Building signage |
| Sector regulator NOC (e.g. RERA, DHA, KHDA) | Regulated activities |
| Structural calculations and drawings | Large or heavy signs |
| Risk assessment and method statement | Electrical signs, or signs fixed above 2.5 m |
Step-by-Step Signage Approval Process in Dubai
- Identify the authority from your location: mainland (DET), free zone (that zone’s authority), or a building, rooftop or land advertisement (Dubai Municipality).
- Check your landlord’s or developer’s signage rules and request the NOC.
- Design the sign to the rules: Arabic placement, one trade name, size, lighting and position.
- Prepare the drawings and mock-up on a photo of your façade.
- Submit the application through the authority’s channel and pay the fee. DDA, for example, accepts applications through its Advertising Single Window system or its customer service centre.
- Wait for the decision. Under the Decree, a complete application is decided within 10 working days (Art. 8).
- Fabricate and install only after approval, then display the permit details as required.
Signage Approval Fees and Processing Time
Fees depend on the authority and the sign type. The DDA publishes its yearly fees for its free-zone areas (DDA):
| DDA sign type | Fee per year |
|---|---|
| Ground-floor shop signage | AED 500 |
| Window stickers | AED 1,000 |
| Flags and free-standing units | AED 1,500 |
| Podium and roof parapet signs | AED 2,500 |
| Rooftop signs, billboards, hoardings, building wraps | AED 5,000 |
DDA adds AED 20 per transaction and estimates 4 working days. For mainland shopfront signs, confirm the current DET fee when you apply. The Decree sets a 10-working-day decision period for complete applications. Allow extra time for the landlord NOC, any sector NOCs and fabrication.
Common Mistakes to Avoid
- Fabricating or installing the sign before approval.
- Placing Arabic below the English, making it too small, or leaving spelling errors.
- Showing more than one trade name, or adding promotions to the façade sign.
- Using a name that doesn’t match the trade licence.
- Applying to the wrong authority, for example DET for a sign in a free zone.
- Missing the landlord NOC or a sector NOC.
- Planning an animated screen or an over-bright sign for a storefront.
Choosing a Signage Company in Dubai
A good signage company designs to the rules from the start, so you’re not paying to redesign later. Golden Point Advertising LLC has produced signages in Dubai since 2002, from 3D signage to outdoor signage for shopfronts.
Our team visits your site, recommends suitable materials and lighting, and advises which landlord and authority approvals to prepare for your location. You approve a digital proof before production, and most signage projects are completed within 7 to 15 working days after design approval. Permits are issued by the relevant authority, so no signage company can guarantee approval.

Frequently Asked Questions
Is signage approval mandatory in Dubai?
Yes. Decree No. 6 of 2020 requires a permit for any advertisement in Dubai, including a business’s façade sign.
Which authority approves shop signboards?
For mainland Dubai, the Department of Economy and Tourism (DET). In a free zone, that zone’s authority, such as the DDA for its free-zone areas.
Do I need landlord approval?
Usually, yes. Authorities such as the DDA ask for the plot owner’s NOC, and many landlords, malls and developers have their own signage rules.
What documents are required?
Typically your trade licence, a scaled drawing, a façade photo and mock-up, a site plan and the landlord’s NOC. Some signs need structural calculations, a risk assessment or a sector NOC.
Can I install illuminated signage?
Yes, if the brightness stays within the permitted levels. Storefront signs must show static content only, so videos and animations are not allowed.
Are Arabic and English required?
Arabic is mandatory and must cover at least 50% of the sign, at the top or right-hand side. English can be added below.
How long does approval take?
The Decree sets 10 working days for a complete application. The DDA estimates 4 working days. Landlord and sector NOCs can add time.
Can I change existing shop signage?
Check with the approving authority first. A permit covers a specific sign, so a new design, size or position may need a new approval.